By Firefighter Proving Grounds on Thursday, 01 June 2017
Category: Private Dwellings

Private Dwelling: "Split level"

 Building Information:

2 Story Peaked Roof Private Dwelling

Note: For this drill the first due engine is connected to a positive water source and is 50 feet from the main entrance

This drill is part of the Firefighter Proving Grounds "Size-Up Series". This series is designed for firefighters to drill and train with their departments using their SOP's

Leave Comments